Član VIP
Detalji proizvoda
A, luɔɔi masin ye looi:
Masin kënë ye luɔ̈ɔ̈i në ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u
II. Kä ye kek looi në mashin ye kek looi:
A lëu bï kä ye kek looi ya looi në 0-30mm yiic, a lëu bï tɛ̈n yenë kek looi ya cɔk tɛ̈n yenë kek looi ya cɔk tɛ̈n yenë kek looi. Masin dɔ ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye.
Third, tɛ̈n yenë masin ye cɔl stoneware looi:
Rotor de masin ye tɔ̈u në tɛmɛ cɛmancɛ, spiral blades ye tɔ̈u në tɛmɛ cɛmancɛ, ye tɔ̈u në tɛmɛ cɛmancɛ, ye tɔ̈u në tɛmɛ cɛmancɛ. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
4. Masin dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r:
Tank, reducer, motor, central axis, spiral blade, bracket composition. Bracket welded on the central axis, spiral blade installed after the bolt pressed, so that the blade does not fall without deformation. Bracket welded on the central axis, spiral blade installed after the bolt pressed with bolt, so that the blade does not fall without deformation.
Lɔ̈ɔ̈m dɔ̈ŋ adhil bɛ̈n tɔ̈ɔ̈u në ye mɛn ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr
5. Masin ye cɔl Stone Washing Machine Installation, Debugging and Testing Operation:
1.After the stone washing machine arrives, the use unit should immediately check if all parts are complete, if there is a damage. 1.After the stone washing machine arrives, the use unit should immediately check if all parts are complete, if there is a damage. N'a tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ
2.The unit of use should design the stone washing machine infrastructure map according to the specific situation of the site, and install the stone washing machine firmly on a solid concrete base. 2.The unit of use should design the stone washing machine infrastructure map according to the specific situation of the site, and install the stone washing machine firmly on a solid concrete base.
3. Tɛ̈n yenë yen tɔ̈ɔ̈u thïn, a adhil bï masin ya tɔ̈ɔ̈u në kë wïc tɛ̈n yenë yen tɔ̈ɔ̈u thïn.
4. Motor ye tääu në guide rail, ago kë ye cɔl belt looseness, belt wheel ku motor belt wheel ye tääu në kë ye cɔl belt wheel.
5.After the above requirements have been adjusted, turn the rotor disk into a few turns to check whether there is a stuck, collision phenomenon. 5.After the above requirements have been adjusted, turn the rotor disk into a few turns to check whether there is a stuck, collision phenomenon.
6. Masin ye cɔl Stone Washing Machine ye tɛmɛ:
1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.
2. A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
3. Loktu de luɔɔi ye 2-4 hours, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
Masin ye cɔl stoneware load operation test:
1.On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test.
2. Masinɛn de luɔɔi adhil bɛ̈n looi, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
3. A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
4. Kɔɔr dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r.
5. Ka tɛmɛ riɛl motɛɛr tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
6. Load operation test needs to be continuous for 5-6 hours, when the operation is confirmed as normal without error, before formally starting production use. 6. Load operation test needs to be continuous for 5-6 hours, when the operation is confirmed as normal without error, before formally starting production use.
Masin kënë ye luɔ̈ɔ̈i në ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u, ɣän tɔ̈ɔ̈u
II. Kä ye kek looi në mashin ye kek looi:
A lëu bï kä ye kek looi ya looi në 0-30mm yiic, a lëu bï tɛ̈n yenë kek looi ya cɔk tɛ̈n yenë kek looi ya cɔk tɛ̈n yenë kek looi. Masin dɔ ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye, a ye raan ye.
Third, tɛ̈n yenë masin ye cɔl stoneware looi:
Rotor de masin ye tɔ̈u në tɛmɛ cɛmancɛ, spiral blades ye tɔ̈u në tɛmɛ cɛmancɛ, ye tɔ̈u në tɛmɛ cɛmancɛ, ye tɔ̈u në tɛmɛ cɛmancɛ. Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
4. Masin dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r:
Tank, reducer, motor, central axis, spiral blade, bracket composition. Bracket welded on the central axis, spiral blade installed after the bolt pressed, so that the blade does not fall without deformation. Bracket welded on the central axis, spiral blade installed after the bolt pressed with bolt, so that the blade does not fall without deformation.
Lɔ̈ɔ̈m dɔ̈ŋ adhil bɛ̈n tɔ̈ɔ̈u në ye mɛn ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr ye kɔɔr
5. Masin ye cɔl Stone Washing Machine Installation, Debugging and Testing Operation:
1.After the stone washing machine arrives, the use unit should immediately check if all parts are complete, if there is a damage. 1.After the stone washing machine arrives, the use unit should immediately check if all parts are complete, if there is a damage. N'a tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ̈n yen tɛ
2.The unit of use should design the stone washing machine infrastructure map according to the specific situation of the site, and install the stone washing machine firmly on a solid concrete base. 2.The unit of use should design the stone washing machine infrastructure map according to the specific situation of the site, and install the stone washing machine firmly on a solid concrete base.
3. Tɛ̈n yenë yen tɔ̈ɔ̈u thïn, a adhil bï masin ya tɔ̈ɔ̈u në kë wïc tɛ̈n yenë yen tɔ̈ɔ̈u thïn.
4. Motor ye tääu në guide rail, ago kë ye cɔl belt looseness, belt wheel ku motor belt wheel ye tääu në kë ye cɔl belt wheel.
5.After the above requirements have been adjusted, turn the rotor disk into a few turns to check whether there is a stuck, collision phenomenon. 5.After the above requirements have been adjusted, turn the rotor disk into a few turns to check whether there is a stuck, collision phenomenon.
6. Masin ye cɔl Stone Washing Machine ye tɛmɛ:
1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.After motor starts, machine should operate smoothly, no abnormal vibration. 1.
2. A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
3. Loktu de luɔɔi ye 2-4 hours, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
Masin ye cɔl stoneware load operation test:
1.On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test. On the basis of a good load test operation, you can do a load operation test.
2. Masinɛn de luɔɔi adhil bɛ̈n looi, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n
3. A tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
4. Kɔɔr dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r.
5. Ka tɛmɛ riɛl motɛɛr tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
6. Load operation test needs to be continuous for 5-6 hours, when the operation is confirmed as normal without error, before formally starting production use. 6. Load operation test needs to be continuous for 5-6 hours, when the operation is confirmed as normal without error, before formally starting production use.
| Model Specifications | XS0540 | XS0750 | XS1050 | XS1250 | XS1550 | |
| Diameter spiral (mm) | 500 | 750 | 1000 | 1200 | 1500 | |
| Dɔŋ spiral (mm) | 4000 | 4500 | 5000 | 5400 | 5400 | |
| Rotational speed (r/min) | 18 | 18 | 18 | 16 | 16 | |
| Yield (t/h) | 3-10 | 5-20 | 10-30 | 30-50 | 50-80 | |
| Motor kony (kw) | 5.5 | 7.5 | 11 | 15 | 22 | |
| Dimensions | Dɔŋ (m) | 6.2 | 6.2 | 7.3 | 7.3 | 7.3 |
| Wɛɛr (m) | 0.67 | 0.8 | 1.25 | 1.44 | 1.85 | |
| Dɔŋ (m) | 1.3 | 1.5 | 2.2 | 2.4 | 2.8 | |
Онлайн разпит
