Tunnel 380v power system construction plan one, tunnel construction information introduction Tunnel construction generally first is the hole hole drop
Detalji proizvoda

Tunnel 380v Power System Construction Plan

1. Tunnel construction wɛ̈t

Tunnel construction is usually first hole drop slope, then cut water trench construction, hole ahead of large pipe shed, large pipe shed injection, drilling, dropping drugs, blasting, excavator discharge, debris, supplementary artillery, initial support, arch or underfloor, drainage board, geotechnical clothing, waterproof board, two lining, trench cable slot, bottom plate.

II. Tunnel Construction Electrical Equipment Introduction

Tunnel hole air compressor, tunnel hole air compressor, tunnel hole lighting, tunnel hole drilling, requires large power large amount of air compressor, such as Atlas air compressor, Sanyi heavy industry air compressor, XCMG air compressor, Kaishan air compressor, five ring air compressor etc. in the construction site often seen, two lining construction spray machine such as Atlas cement ground spray machine, CNC can move rock excavator etc., conveying pump, tunnel water pump, if there is a support period with wire welding machines, the hole in general construction will not exceed 150KW of electrical equipment, hole hole equipment 200kW, cement dump plant power is about 400KW, there are also some construction sites using tunnel excavator, shield, TBM and other large equipment, over 1000KW. load will be greater.

Third, Tunnel Construction Electric System Traditional Method (Tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr tɛɛr)

Në ye mɛn, 380v low voltage power supply (ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye mɛn ye Kɔc kɔ̈k ye tɔ̈u në ɣän kɔ̈k yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic yiic. Na tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ

4. Tunnel Construction Electric System Traditional Solutions

Soldiers don't move grain and grass first, as the foundation guarantee of tunnel engineering - power supply, but if the power system doesn't give power, difficult construction won't be able to talk about, we as many years tunnel construction power system support equipment suppliers, summarizing the experience as follows, in the 500 m within the power system, small equipment has no need to be modified can basically satisfy construction, if more than 500 m using 10KV high voltage electrical inlet hole costs too high, and more than 1000 m using diesel power generation equipment, costs can't be underestimated. Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛ A bɛ se ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u ka tɔ̈ɔ̈u.

5. Analisis

Kɔɔr diäk wɛ̈t ye kɔɔr në tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ:

1, tɛ̈n yenë yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen

2、Tunnel hole construction site multi-distance hole transformer remote voltage low

3, tunnel hole construction site multi-line remote equipment start current large instant pressure drops, so that the equipment can't start. 3, tunnel hole construction site multi-line remote equipment start current large instant pressure drops large instant, so that the equipment can't start.

4.Tunnel tunnel in the tunnel hole is longer than 2500 meters and does not want to use 10KV high voltage

6. Solution of Problems (Solution of Problems) (Solution of Problems) (Solution of Problems) (Solution of Problems) (Solution of Problems) (Solution of Problems) (Solution of Problems) (Solution of Problems)

Ɣok ye yïn gäm paket atat:

1, luɔɔi 380v lifter bɛ voltage compensation juak 60-100v, juak to certain value (safety value) motor, motor start, contactor coil voltage will not be low voltage tripping value anymore, from can be started, after starting the voltage will drop to 400v or so, after loading guarantee 380v.

2, luɔɔi de 380v l 1200v lifter 1, 1200v 400v transformer 1. 1200v voltage bɛ̈n ya tɔ̈ɔ̈u në 95 sq. mm ye tɔ̈ɔ̈u në 2000 m ye tɔ̈ɔ̈u në 1200v ye tɔ̈ɔ̈u në 400v ye tɔ̈ɔ̈u në 1200v ye tɔ̈ɔ̈u në 1200v ye tɔ̈ɔ̈ Lɔ̈k tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n Kɔn na yɔ̈ɔ̈r ba waya dɔ̈ɔ̈r looi.

3, (suitable for high precision equipment) adopting our company elevator regulating voltage one, to raise the voltage to a value, the equipment starts voltage dropping, we compensate the voltage dropping, before the voltage drops to the contactor jump off to compensate the voltage up, the equipment starts normally, the voltage returns to the normal value.

7. Wɛ̈t cï rot looi

1、麻zhu high speed、中铁一公局 中铁一一公局 ye baara kɛ në Hubei.

2、Jingshen High Rail、中铁五局 1500m Equipment Power 300kW

3, Yangling Avenue High Rail, Middle Rail One Station, 300KW, 1500 m

4, Shijiazhuang Metro, Central Railway Seven Station, 110 kilowatt ye yic 1000 m.

5, Hubei Zhanghong Lake High Speed, Central Rail 12 Bureau, Equipment Power 100 kW, Distance 1800 m.

6、Shaanxi Six Plate Water Railway、中铁12局、设备100kW、距离2000m

7、Zhejiang Shungji Group、Yinyong High Speed、Equipment 200kW、Distance 1400m

8, Fujian Longnan High Rail, Middle Rail Eleven, Equipment Power 200kW, Distance 1600m

9, Jinli Wen Gas Transmission Tunnel, Midwater 12th Bureau, Equipment 75kW, Distance from Hole hole 2000m

10, Zhangjiakou High Speed, Medium Iron Eleven, Equipment 75kW, Distance 2400 m,

8. Thanksgiving Unit

Shijiazhuang Railway University Department of Civil Engineering

Shijiazhuang Zhejiu Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin Yin

Sanyi Heavy Industries, XCMG Group, Sino Rail Group, Sino China Group, Sino Water Group ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ ye dɛmɛ


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!