Yangzhou Transformer Loaded Switch TesterFunksiɔn Features
1, instrument output open circuit voltage is 30V, in the current of 1A can test the transition resistance of 30Ω, can automatically calculate the transition resistance value and the transition time value. 1, instrument output open circuit voltage is 30V, in the current of 1A can test the transition resistance of 30Ω, can automatically calculate the transition resistance value and the transition time value.
2, Transformer ye load switch tester output current ye dït, ye kɔnɔ ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor ye koor.
3.The instrument has a perfect protective circuit, a strong reliability. 3.The instrument has a perfect protective circuit, a strong reliability. 3.The instrument has a perfect protective circuit, a strong reliability. 3.The instrument has a perfect protective circuit, a strong reliability.
4, instrument ye LCD screen ye nyuɔɔth, a ye kɛ̈ɛ̈k bï ya luui në ɣän kɔ̈k yiic.
5, a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ a tɛmɛ
Yangzhou Transformer Loaded Switch TesterDon't Say
Transformer Loaded Switch Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch AC Parameter Tester, Transformer Loaded Switch AC Parameter Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch Parameter Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch Parameter Tester, Transformer Loaded Switch Tester, Transformer Loaded Switch Parameter Tester
Teknik Indikator
1, tɛ̈n yenë kek them: tɛ̈n yenë kek them: 0.5Ω ~ 30Ω
Wakat ye looi: 0 ~ 250ms
2, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
Wakat ye yɔ̈ɔ̈k: ± ((0.1% ye kɔn + 3 wɛ̈t)
3, output current: 1.0A
4, luɔɔi: AC 220V ± 10%
5, Power Frequency: 50Hz ± 1Hz
6, tɛmɛ tɛmɛ: -10 ℃ ~ 50 ℃
7, ye luui në ɣän ke piny: ≤85%RH
